Once in Asheville, the passenger train rolls through the yard on its way to today’s final station stop. After the passengers get off, the crew will pull the train onto the siding, cut loose the E6 engines, and take them down the track to the shops. The crew will remain overnight in Asheville and make the return trip to Spencer in the morning.